Planned Fibre Ring Maintenance in London
Scheduled Maintenance Report for Simwood
Completed
The scheduled maintenance has been completed.
Posted Dec 20, 2024 - 05:00 UTC
In progress
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Posted Dec 20, 2024 - 01:00 UTC
Scheduled
We will be performing planned maintenance on our London fibre ring between 01:00 and 05:00 UTC, during which an intermediate regeneration point will be removed. This will temporarily affect the fibre link between our London Telehouse East and Volta (Great Sutton Street) site until it can be re-spliced. While other redundant routes will remain available between these sites, connectivity will be temporarily reduced and therefore considered at risk.

This maintenance was originally scheduled for 19th, but wasn’t completed during the maintenance window, so has been rescheduled for the 20th.
Posted Dec 19, 2024 - 17:48 UTC
This scheduled maintenance affected: Availability Zones (London).