At Risk: SS7 Switch Upgrades - Slough
Scheduled Maintenance Report for Simwood
Completed
Unfortunately this maintenance has not taken place and will be rescheduled.
Posted Dec 07, 2015 - 20:42 UTC
Scheduled
As part of our ongoing maintenance we will be upgrading part of our SS7 infrastructure in our Slough site on the evening of Monday 7th December.

This essential maintenance work, which echos that carried out on Monday 23rd November to the equipment in London, has been scheduled when the network is quieter to minimise the risk of any disruption, however we are issuing an At Risk Notification as we will be operating with reduced resiliency and capacity during the 3 hour window, although we expect the work to be completed in a much shorter timeframe.

Simwood operate resilient SS7 links into multiple BT exchanges, from multiple sites, as well as other carriers and we do not anticipate any noticeable side-effects for our customers while this work is taking place.
Posted Dec 04, 2015 - 15:39 UTC